TubaliMaterial price catalogue

Official reference prices · October 2026

Labour and installed rates

From other sources.

Each row is that publisher’s own figure and date. They are not averaged with the Ministry’s prices or each other.

44 prices
ItemSourceUnitEGPPrice date
Interior painting labourQS Mindm²599 Nov 2026
Tiling labour (supply of labour only)QS Mindm²1129 Nov 2026
Gypsum board ceiling, supply and installQS Mindm²5159 Nov 2026
Pharaonic stone cladding fixing, labour only (cement fixing)QS Mindm²1257 Nov 2026
Pharaonic stone cladding, supply and install (cement fixing)QS Mindm²3407 Nov 2026
Half-brick walls 12 cm, labourQS Mindm²3028 Oct 2026
Internal plaster, labourQS Mindm²3628 Oct 2026
Ceramic floor tiling, labourQS Mindm²9529 Oct 2026
Porcelain floor tiling, labourQS Mindm²12029 Oct 2026
Ceramic wall tiling, labourQS Mindm²9030 Oct 2026
Internal plastic painting, labourQS Mindm²6522 Oct 2026
Internal plastic painting, supply and applyQS Mindm²14030 Oct 2026
Gypsum board ceiling, supply and installQS Mindm²4001 Nov 2026
Bitumen membrane 4 mm, torch-appliedQS Mindm²24031 Oct 2026
Electrical point, labourQS Mindpoint10027 Oct 2026
Plumbing point, labourQS Mindpoint31027 Oct 2026
Internal plaster, supply and applyQS Mindm²102.527 Oct 2026
Gypsum board ceiling, labourQS Mindm²1201 Nov 2026
Gypsum board partition 100 mmQS Mindm²37527 Oct 2026
Suspended tile ceiling 60×60QS Mindm²27027 Oct 2026
Cementitious waterproofing for wet areasQS Mindm²17027 Oct 2026
Hollow block walls 20 cm, labourQS Mindm²37.527 Oct 2026
Tile skirting, labourQS Mindlinear m3127 Oct 2026
Saw cutting of RC slabs and heavy floors, per linear mQS Mindm77527 Oct 2026
Sandwich panel 75–100 mm, core not stated, supply and installQS Mindm²1,90027 Oct 2026
Roof sandwich panel, PU core 40 mm, supply and installQS Mindm²96527 Oct 2026
Wall sandwich panel, PU core 50 mm, supply and installQS Mindm²96527 Oct 2026
Steel structure for aircraft shelter or hangar, 25–40 m clear span, per m² coveredQS Mindm² covered plan area3,52727 Oct 2026
Structural steel, heavy sections, fabricated, primed and erectedQS Mindt77,88627 Oct 2026
Structural steel, light sections, fabricated, primed and erectedQS Mindt70,42227 Oct 2026
Structural steel, medium sections, fabricated, primed and erectedQS Mindt78,37327 Oct 2026
Steel structure for warehouse, 25–40 m clear span, per m² coveredQS Mindm² covered plan area2,35127 Oct 2026
Underground RC pump room shell, per m² of internal floor areaQS Mindm² internal floor16,69027 Oct 2026
Underground RC water or fire-water tank, 1000 m³ net, per m³ of capacityQS Mindm³ net capacity4,08027 Oct 2026
Underground RC water or fire-water tank, 100 m³ net, per m³ of capacityQS Mindm³ net capacity6,56827 Oct 2026
Underground RC water or fire-water tank, 250 m³ net, per m³ of capacityQS Mindm³ net capacity5,54427 Oct 2026
Underground RC water or fire-water tank, 500 m³ net, per m³ of capacityQS Mindm³ net capacity4,56727 Oct 2026
Underground RC water or fire-water tank, 750 m³ net, per m³ of capacityQS Mindm³ net capacity4,30227 Oct 2026
General labourerQS Mindday7001 Nov 2026
Formwork carpenterQS Mindday1,2001 Nov 2026
Steel fixerQS Mindday1,35027 Oct 2026
PainterQS Mindday1,1001 Nov 2026
Wheel loaderQS Mindday2,75027 Oct 2026
ExcavatorQS Mindday3,65028 Oct 2026